Difference between revisions of "User:PaulBlay"

From RogueBasin
Jump to navigation Jump to search
Line 5: Line 5:
* Mar 25, 2009 : 37 open tickets, 5 closed.
* Mar 25, 2009 : 37 open tickets, 5 closed.
* Mar 26, 2009 : 38 open tickets, 7 closed.  I'm starting to get to grips with how much stuff needs doing to get the objects all working right.  Luckily the ticket system at the [http://sourceforge.jp/projects/angband65/ SourceForge page] helps me keep track of what I'm doing but it's pretty heavy going.
* Mar 26, 2009 : 38 open tickets, 7 closed.  I'm starting to get to grips with how much stuff needs doing to get the objects all working right.  Luckily the ticket system at the [http://sourceforge.jp/projects/angband65/ SourceForge page] helps me keep track of what I'm doing but it's pretty heavy going.
* Mar 27, 2009 : 38 open tickets, 8 closed.  I realise at this point that I could have done things quite a bit quicker with a different method, but that work's mostly done now.  I've decided to rename the versions of future milestones to be a bit more realistic.  (There won't be a proper beta release for quite some time).

Revision as of 17:04, 27 March 2009

I'm currently working on XAngband, TinyAngband and now Angband/65. I also understand Japanese, so if you need anything translated let me know.

Angband/65 progress track:

  • Mar 25, 2009 : 37 open tickets, 5 closed.
  • Mar 26, 2009 : 38 open tickets, 7 closed. I'm starting to get to grips with how much stuff needs doing to get the objects all working right. Luckily the ticket system at the SourceForge page helps me keep track of what I'm doing but it's pretty heavy going.
  • Mar 27, 2009 : 38 open tickets, 8 closed. I realise at this point that I could have done things quite a bit quicker with a different method, but that work's mostly done now. I've decided to rename the versions of future milestones to be a bit more realistic. (There won't be a proper beta release for quite some time).